Overall shower room installation diagram steps for

2022-07-22
  • Detail

The whole shower room is convenient to use, especially for the elderly and children at home, which can ensure their personal safety. So, how to install the whole shower room? Next, let's introduce the steps of installing the integral shower room and enjoy the installation diagram of the integral shower room. Then, interested friends can learn how to install the whole shower room next

the whole shower room is convenient to use, especially if there are old people and children at home, which can ensure their personal safety. So, how to install the whole shower room? Next, let's introduce the steps of installing the integral shower room and enjoy the installation diagram of the integral shower room. Then, interested friends can learn how to install the whole shower room next

I. installation diagram of the overall shower room

the basic structure of the overall shower room is a bottom basin + a fence, so the overall shower room is to install the bottom basin first, and then install the fence and other frames. The installation diagram of the overall shower room is as follows:

II. Installation steps of the shower room

1. When installing the overall shower room, first divide the corresponding space from the bathroom, so as to determine the installation position of the overall shower room, so as to determine where the waterways are distributed and how to drill holes during decoration

2. When installing, first assemble the bottom basin at a fixed position. If there is water in the test bottom basin, it is generally inclined during installation, so be sure to check whether the water in the lower bottom basin is flat after installation

3. Therefore, the third step is to conduct a waterproof experiment on the installed bottom basin. If there is water leakage or water channel blockage, it is necessary to correct it in time before proceeding to the next step

4. The shower door has a sliding door. After the waterproof test of the bottom basin is OK, the track can be installed, and the lower track should be installed in the middle of the stone foundation

5. Then install the aluminum alloy frame, first clip the edge material into the upper and lower guide rails, lock it with screws, install the aluminum material against the wall on the left and right sides, place the assembled shower room frame in the center of the stone foundation, and adjust the horizontal position. Then, a hole is made in the aluminum material against the wall, and the aluminum alloy frame is locked on the stone base with fastening screws

6. Then, the back of the bottom basin and the shower screen should be fixed with screws, and the fixing pieces on both sides

7. Insert the sealing strip into the gap between the glass and the frame, so that the glass will be clamped more tightly

8. After fixing, install the sliding door handle, assemble the top cover, and seal the edge with glass glue

9. Connect the cold and hot water pipes and discharge water to check whether the water supply is normal

10. Connect the sewer pipe, insert the pipe, seal the periphery of the pipe mouth with glass glue, and conduct the waterproof test again. If there is no water leakage or blockage, the installation is successful

editor in chief: the installation diagram of the overall shower room and the installation steps of the shower room are introduced. I hope I can provide you with help. During installation, you should also pay attention to the alignment between the water outlet of the bathtub and the outlet of the sewer pipe, otherwise it will affect the drainage and the sanitation of the bathtub

济南妇产医院

昆明试管婴儿医院

沈阳男科医院

成都癫痫医院

Copyright © 2011 JIN SHI